Geoquest Ltd New Zealand Provides Reinforced Earth® Wall and Eleven Bridge Abutments, TechSpan® Arch with Seismic Design

When completed, in May 2020, the Transmission Gully Motorway Project (TGP) will provide a new, 27-km-long, four-lane highway north of Wellington, New Zealand. This modern and safe main highway will bypass the coastal communities and space-limited choke points which resulted in ever increasing traffic congestion on the existing SH1 highway.
The project is highly complex, with the alignment in places crossing steep, difficult, terrain and in other places crossing flood plains with deep, soft foundation soils. For much of its length the alignment is close to the active Ohariu fault. Twenty-five new bridges and large culverts are required over the length of the alignment. Many of the bridges are single span structures, with spans ranging from 22 m to 38 m.
The Wellington Gateway Partnership (WGP) and the New Zealand Government formed a Public Private Partnership (PPP) to deliver the Project. The WGP subcontracted the Design and Construction of the Project to a Joint Venture between CPB Contractors Pty Ltd and HEB Construction Ltd (a VINCI subsidiary), known as CPB HEB JV.
CPB HEB JV contracted Geoquest Ltd New Zealand for the design and supply of materials for 10 bridge abutments using the Reinforced Earth® technique.
Geoquest considered in the design the proximity to the active Ohariu Fault with an effective magnitude of 7.
After the contract was signed, Geoquest Ltd was awarded two further structures: abutments for a further single span bridge and a TechSpan® concrete arch system with extensive, associated Reinforced Earth® Walls.
The abutments for the eleven single span bridges required a total of about 8,500 m2 of TerraClass® precast concrete facing panels, with the height of the walls varying between 1.6 m and 10.7 m.
The TechSpan® arch has a nominal span of 14 m with a height of 6.8 m. Associated Reinforced Earth® portal walls comprised 2,100 m2 of TerraPlus® precast concrete facing panels up to a maximum height of 16.8 m.
Construction of the first set of Reinforced Earth® Abutments began in July 2017, with all Reinforced Earth® structures substantially complete in October 2019.
Riverbank Protection with Techrevetment® Technology at Karnavati River, Uttar Pradesh
Design and Construction of TerraGreen for Wetland Park project
Coastal Embankment Protection at Maheshkhali
Design, material supply, on-site casting, and construction of Reinforced Earth® wall structures for Philippines’ Cebu Airport
First Low Carbon Footprint MSE Wall in the Philippines
Slope Protection and Drainage Improvement at Tindharia on National Highway 110 (Previously Nh-55) in Darjeeling District of West Bengal, India
Design, material supply, technical assistance of Reinforced Earth® wallstructures for Chom Chao Interchange in Phnom Penh City – Capital of Cambodia
Slope Protection and Road Widening of Stretches at Nh 59 of Daringibadi in Odisha by using Terralink® Technology
Design, material supply, technical assistance of Reinforced Earth® wall structures for DT711 mixed abutment
Design, material supply, technical assistance of Reinforced Earth® wall structures for Dong Da boat station seawall
Design, material supply, technical assistance of Reinforced Earth® wall structures for DT711 overpass mixed abutments
TechWall™ Retaining Walls for Pedestrian Crossing
Design, material supply, technical assistance of Reinforced Earth® wall structures for DT711 overpass mixed abutments
Design, material supply, technical assistance of Reinforced Earth® wall structures for DT711 mixed abutment
Reinforced Earth® Walls for Highway 407 East Phase 2
Riverbank Protection with Techrevetment® Technology at Karnavati River, Uttar Pradesh
First Low Carbon Footprint MSE Wall in the Philippines
Design, material supply, technical assistance of Reinforced Earth® wall structures for Dong Da boat station seawall
Design, material supply, on-site casting, and construction of Reinforced Earth® wall structures for Philippines’ Cebu Airport
TechWall™ Retaining Walls for Uchumayo Motorway
Slope Protection and Road Widening of Stretches at Nh 59 of Daringibadi in Odisha by using Terralink® Technology
Design and Construction of TerraGreen for Wetland Park project
Coastal Embankment Protection at Maheshkhali
Design, material supply, technical assistance of Reinforced Earth® wallstructures for Chom Chao Interchange in Phnom Penh City – Capital of Cambodia
Slope Protection and Drainage Improvement at Tindharia on National Highway 110 (Previously Nh-55) in Darjeeling District of West Bengal, India
Design, material supply, on-site casting, and construction of Reinforced Earth® wall structures for Philippines’ Cebu Airport
Design, material supply, technical assistance of Reinforced Earth® wall structures for DT711 mixed abutment
Coastal Embankment Protection at Maheshkhali
Slope Protection and Road Widening of Stretches at Nh 59 of Daringibadi in Odisha by using Terralink® Technology
Design, material supply, technical assistance of Reinforced Earth® wallstructures for Chom Chao Interchange in Phnom Penh City – Capital of Cambodia
Slope Protection and Drainage Improvement at Tindharia on National Highway 110 (Previously Nh-55) in Darjeeling District of West Bengal, India
Design, material supply, technical assistance of Reinforced Earth® wall structures for DT711 overpass mixed abutments
Design, material supply, technical assistance of Reinforced Earth® wall structures for Dong Da boat station seawall
Design and Construction of TerraGreen for Wetland Park project
Riverbank Protection with Techrevetment® Technology at Karnavati River, Uttar Pradesh
First Low Carbon Footprint MSE Wall in the Philippines
You want to contact an expert ?